
The Great Worm Ouroboros, a symbol of infinity, since it’s eating its own tail. Although Renos seem to go on forever, I actually had a different metaphor in mind. But it was harder to Google.
This is not a post about the library renos, they’re done. Also, way too late, I realised that I wasn’t thinking of the Great Worm Ouroboros, but of the infinitely recursive nature of Critical Path Analysis, but I thought the first title was better, semantically speaking. Votes in the comments section please.
We got lucky, finding this house. It needed work, it was old, and they showed it while work was still in progress on the basement, putting a lot of people off. We didn’t exactly pick it up cheap, but we got a bargain. We’ve sunk a fair amount of work into it, but now we’ve been living here five years, we’ve really thought about the changes we want to effect. Things we’ve been putting up with for a while have reached the point where we’re going to DO something.
That’s where we encounter the infinitely recursive nature of Critical Path Analysis. Our bedroom faces the street. In the summer, when the nights are warm and the windows are open, we’re occasionally woken by people chatting as they walk past the house late at night. So we decided to swap the bedroom and the room behind it, which is currently used as the study. Before we can do that, I have to take down the closet in the corner, because it’s not a useful one.

Two weeks later, and there’s still loads to get rid of. Plus, we’re still using the study, so every destructo session has to be followed by cleanup.
So far, so traditionally linear. But removing the closet is simply the first thing I have latched on to because it’s something I can DO. It doesn’t need measuring, or wiring diagrams, or forward planning (except vaguely wondering if that’s a supporting wall I’m whacking on with my lump hammer…). Because if we’re moving the bedroom, it only makes sense to sort out the shocking bathroom on the main floor too. So we found a new toilet on sale, which is just as well because our old cistern is on the way out, but before we can put in the new toilet, we need to redo the flooring, and we can’t do that because we haven’t got the new tub, which we can’t install anyway because we have to shift the shower plumbing to the other side and we can’t do that without a builder to advise us. And we can’t get the builder in until we’re ready to move ahead with the next phase of changing the windows in the new bedroom, because it makes sense to get the guy to quote for several jobs at once so we can prioritise our expenses, right?
Recursive critical path. Before this, there’s that… And at the same time, I’m wondering how much it’ll cost to move the Internet Access point from the current study to the old bedroom, and if we can use this opportunity to split off a cable running direct to the Living room so I don’t have to run my TV internet off the wireless, which is still on a party line with next door, and while we’re at it why don’t we go for a new dedicated fibre optic line into the house to triple the internet speeds? But to do that we have to go to another supplier, which means changing our email addresses, and they are linked to about sixty per cent of the web services we use, aren’t they? So, can I change them BEFORE we move to a new supplier, or can we get them changed automatically? And what happens to the inevitable one or two things that get missed in the changeover and send sad and lost emails to the old address for five years while we remain in blissful ignorance? And we can’t be the only people doing this, can we?
Ok, maybe the idea of a worm who eats his own tail forever was the right one. And thinking about this, I have a strong urge to just pick up the hammer again, and take a few cathartic swings at this wall right…here…